Design Work on Interstate 30 Requires Lane Closures in Little Rock
Information Release
Arkansas Department of Transportation
NR 20-250
August 28, 2020
PULASKI COUNTY (8-28) – Crews performing design work along the Interstate 30 corridor in Little Rock will require eastbound shoulder and frontage road lane closures along the Interstate, according to Arkansas Department of Transportation (ARDOT) officials.
Weather permitting, this work will occur between Tuesday, September 1 and Thursday, September 3, from 9:00 a.m. to 3:00 p.m. Crews will close the eastbound I-30 outside shoulder between 9th and 6th streets for bridge abutment sampling, and the eastbound frontage road right lane between 9th and 6th streets for surveying.
Traffic will be controlled with construction barrels and signage. The public is advised to be cautious when traveling in the work zone and watch for slower traffic speeds.
The 30 Crossing project (Job CA0602) is part of ARDOT's Connecting Arkansas Program. More information on the CAP is available at ConnectingArkansasProgram.com.
Drivers should exercise caution when approaching and traveling through all highway work zones. Additional travel information can be found at IDriveArkansas.com or ARDOT.gov. You can also follow us on Twitter @myARDOT.